快(kuai)遞物流(liu)分(fen)揀(jian)線(xian),快遞(di)物流分揀流水(shui)線,快遞分揀輸(shu)送(song)線主(zhu)線長度:20~10米。
快遞物(wu)流分揀線,快遞物流分揀流水線,快遞分揀輸送線分揀道(dao)口數量(liang):30~150個(ge)。
快遞物流分揀線,快遞物流分揀流水線,快遞分揀輸送線分揀小車數(shu)量:160個。
總用(yong)電(dian)功率(lv):15~30KW。
快遞物流分揀線,快遞物流分揀流水線,快遞分揀輸送線可(ke)分揀的產品的重量:更大40公(gong)斤(jin)
可分揀的快遞包(bao)件更大(da)尺寸:W500*L800MM
快遞物流分揀線,快遞物流分揀流水線,快遞分揀輸送線生產(chan)周(zhou)期(qi):2~3個月(yue)。
安(an)裝(zhuang)調試(shi)周期:4~6周(不包括(kuo)同客戶信息係統(tong)聯調(diao))。
The two-way exit cross belt sorter is suitable for square field, and more sorting crossings are arranged within the length of the line; the mass production has the advantages of low cost and fast implementation.
Main line length: 20 ~ 10m.
Number of sorting Crossings: 30-150.
Number of sorting cars: 160.
Total power consumption: 15 ~ 30kW.
Weight of sortable products: up to 40 kg
Maximum size of sortable express package: w500 * l800mm
Production cycle: 2-3 months.
Installation and commissioning cycle: 4-6 weeks (excluding joint commissioning with customer information system).